PAMS by Colonnade Audit

Clear project health and audit for capital works.

PAMS by Colonnade Audit replaces subjective status reporting with a standardized 69-point deterministic audit engine, automated root-cause findings, and a 4-page executive report for construction and capital projects.

Built exclusively for Construction, MEP, Civil Infrastructure, Healthcare Facilities, and Government Public Works.

Trusted Framework for Capital Infrastructure PMOs

69

Standardized Inputs

8

Audit Core Areas

4-Page

Board Ready PDF

Zero

Agile Jargon

Stop watermelon reporting

Traditional status decks stay green while the site is in crisis. PAMS by Colonnade Audit replaces opinion with a locked 69-input engine: 5 HSE triggers, 40 evaluation questions, and 24 red-flag toggles.

Traditional reporting

  • Green slide decks hiding red site conditions
  • Informal baseline shifts concealing critical path delay
  • Days spent compiling disconnected spreadsheets
  • Vague actions with no owner or enforceable due date

PAMS standardized engine

  • Deterministic 0–100% health score from 69 field inputs
  • 24 red-flag triggers for unauthorized change and claims
  • 1-click 4-page executive PDF with signature blocks
  • Automated CAP with P1 / P2 / P3 WHO and WHEN assignments

8 Core Audit Areas

Every capital project is scored objectively across the 8 locked Waterfall pillars: Scope Management (18%), Schedule / CPM (18%), Budget / EVM (18%), Risk & Opportunity (16%), Resource & Logistics (10%), Stakeholder Alignment (5%), Quality Assurance (10%), and Project Governance (5%). Sector and phase labels never change the 69-input questionnaire.

18%

Scope Management

Baseline lock, WBS integrity, and formal Variation Order control.

18%

Schedule (CPM)

Critical Path Method integrity, float, and Extension of Time claims.

18%

Budget (EVM)

Earned Value, contingency draw-down, and Estimate at Completion.

16%

Risk Management

Quantified registers, assigned owners, and mitigation plans.

10%

Resource Allocation

Labor productivity, plant utilization, and trade mobilization.

5%

Stakeholder Engagement

RFI turnaround, statutory approvals, and communication matrix.

10%

Quality (QA/QC)

ITP hold points, NCR close-out, and material certification.

5%

Governance

Delegation of Authority, steering committee, and statutory compliance.

Stop-Work HSE Safety Gate

Health & Safety Red Override is absolute

Safety is non-negotiable. Before Scope, Schedule, or Budget are evaluated, the 5-point HSE Safety Gate checks for Stop-Work Orders, fatal or severe reportable incidents, missing or unapproved HSE plans, uncertified critical equipment or operators, and major environmental or statutory breaches. If ANY trigger is marked BREACH REPORTED, the overall project health score is automatically hard-capped at 49% (RED / CRITICAL), regardless of commercial performance.

Built for physical delivery

PAMS by Colonnade Audit is engineered for complex, legally binding schedules, budgets, and safety obligations on capital works.

General Building & High-Rise

General Building & High-Rise: ensure structural milestone discipline, sub-contractor alignment, and formal Variation Order control on physically delivered capital works.

MEP & Industrial Facilities

MEP & Industrial Facilities: audit tight multi-trade interfaces, equipment testing gates, and commissioning schedules where construction, mechanical, and electrical baselines must stay locked.

Civil Infrastructure

Civil Infrastructure, Roads & Highways: track linear progress, right-of-way handovers, earthwork baseline variations, bulk materials, and critical path delays.

Healthcare Facilities

Healthcare & Hospital Infrastructure: maintain stringent compliance, cleanroom validation gates, and MEP commissioning discipline on occupied or regulated facilities.

Government Public Works

Government & Public Works: meet strict public procurement governance, statutory milestones, and audit-grade records required for public-sector capital delivery.

Run a 69-point audit in 10–15 minutes

Set the project baseline, pass the HSE gate, score eight Waterfall areas, and download a locked 4-page board report.